Germany – Construction work – Energieverwertung Schwaben gKU, Windows, New Construction of a Sewage Sludge Drying Facility with Pyrolysis and an Administration Building
The planned building consists of halls for the sewage sludge upcycling plant and an administration building. The hall is an L-shaped structure with a total length of 60.00 m and a width of 40.10 m. The hall is single-storey. The n
Opportunity description
The planned building consists of halls for the sewage sludge upcycling plant and an administration building. The hall is an L-shaped structure with a total length of 60.00 m and a width of 40.10 m. The hall is single-storey. The northern part of the hall, which houses the delivery area, has a partial basement. The ridge height of the monopitch roof is approximately 11.12 m. The long side of the hall has a monopitch roof height of approximately 16.20 m. A pellet heating system is located in the south-western part of the hall. The hall will be constructed using a reinforced-concrete frame structure with a roof support structure made of timber trusses and sandwich panels. The hall has a total gross floor area of 1,642 m². The administration building is located to the south-west of the hall and will be separated by a fire wall. The administration building consists of a ground floor and an upper floor. It has a length of 15.19 m and a width of 9.89 m. The entire building will be constructed as a solid reinforced-concrete structure. The roof will be constructed as a flat roof with a parapet and bituminous waterproofing. The uppermost storey in which habitable rooms are possible is located an average of 3.21 m above ground level. The administration building consists of one occupancy unit. The gross floor area of the administration building is 151 m², height 7.00 m. The bill of quantities and the schedule are additionally incorporated by reference. Windows - Production (main areas): - Plastic windows - Technical processing Schedule requirements: Windows: Start 14.09.26; Completion 09.10.26 In all other respects, reference is made to the schedule (contractual deadlines) in the procurement documents. The bill of quantities and the documents and plans contained in the procurement documents are additionally incorporated by reference. Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.