Germany – Construction work for iron bridges – ABS Leipzig – Dresden, replacement construction of the EÜ Neu-Medessen incl. replacement power supply in Priestewitz
Key data (not exhaustive): - Replacement construction of a double-track reinforced-concrete semi-frame structure with parallel wing walls (bridge area approx. 88 m², clear span 5.45 m, clear height 3.35 m, width between railings 11.88 m) - Concrete and reinforced-concrete work involving approx. 370 m³ of reinforced concrete, approx.
Opportunity description
Key data (not exhaustive): - Replacement construction of a double-track reinforced-concrete semi-frame structure with parallel wing walls (bridge area approx. 88 m², clear span 5.45 m, clear height 3.35 m, width between railings 11.88 m) - Concrete and reinforced-concrete work involving approx. 370 m³ of reinforced concrete, approx. 550 m² of concrete surfaces and approx. 100 t of B500B reinforcing steel bars - Earthworks, shoring and dewatering work involving approx. 1,000 m³ of soil excavation, approx. 500 m² of shoring, and the installation and operation of a dewatering system to keep the excavation pit free of water - Track construction work involving the construction and removal of approx. 110 m of track superstructure Temporary securing of an overhead-line mast - Construction of approx. 70 m² of noise barrier - Installation of the construction-stage configuration of the EEP point-heating system - Construction of a new power-supply mast - Laying of OSE cables in the existing cable trough between the power-supply mast and the signal box - Approx. 14 m of temporary piping for a drainage ditch - Approx. 20 m² of shoring Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.