Germany – Construction work for kindergarten buildings – Replacement construction of the nature kindergarten at Fliegerhorst, 04758 Oschatz, Am Forsthaus, Lot 11 - Painting and varnishing work
Replacement construction of the nature kindergarten at Fliegerhorst, 04758 Oschatz, Am Forsthaus, Lot 11 - Painting and varnishing work SITE SETUP - 1 lump sum General site setup - 1 lump sum Provision of scaffolding PREPARATORY WORK - 700 m² Windows and door
Opportunity description
Replacement construction of the nature kindergarten at Fliegerhorst, 04758 Oschatz, Am Forsthaus, Lot 11 - Painting and varnishing work SITE SETUP - 1 lump sum General site setup - 1 lump sum Provision of scaffolding PREPARATORY WORK - 700 m² Masking windows and doors with PE film - 350 m Masking at color transitions or ceiling rails and wooden beams - 4050 m² Cleaning the substrate WALL SURFACES - 4100 m² Q3 filling of drywall walls - 4100 m² Full-surface reinforcement with fiberglass filler fleece - 4100 m² Wall coating, white or lightly tinted - 290 m² Surcharge for coating surfaces, yellow/green - 520 m Coating of reveals - 54 m Edge protection, stainless steel - 2500 m Joint sealing, permanently elastic - 2100 m² Base area of wall surfaces - 2000 m² Repair work CEILING SURFACES - 180 m² Re-sanding ceiling surfaces - 180 m² Ceiling coating, white, closed gypsum plasterboard ceiling, filled ceiling - 72 m Coating of reveals of flat-roof windows - 50 m Painting ceiling aprons, width up to 1.0 m COATING OF WOODEN COMPONENTS - 730 m Secondary beams, on 3 and 4 sides - 60 m Columns, on 4 sides - 55 m² Visible roof ceiling from below, made of multilayer wood panel PAINTING WORK - 19 pcs Coating of steel U-shaped frames 0.76-1.135 x 213.5 cm, wall thickness 10-25 cm - 3 pcs Coating of sheet-metal covers for heating circuit manifolds, green/yellow FLOOR COATING IN BUILDING SERVICES ROOMS - 70 m Cutting off protruding edge insulation strips - 55 m² Cleaning cement screed substrate - 55 m² Coating cement surfaces , PLANNED PERFORMANCE PERIOD: Start of construction 07.04.2026; completion of construction 14.08.2026; REPAIRS AND REMAINING WORK: by the end of November 2026 Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.