Germany – Construction work for school buildings – Replacement construction of the State Vocational School in Regen with FOS: Road construction works, Areas 1 and 2
Building dimensions: Main school building: consisting of basement, ground floor, 1st upper floor and 2nd upper floor, L/W approx. 103 m x 87.5 m, height up to approx. 17 m Metal ancillary building: consisting of basement, L/W approx. 18.5 m x 7.8 m, height up to approx. 5 m Waste and bicycle shelter ancillary building:
Opportunity description
Building dimensions: Main school building: consisting of basement, ground floor, 1st upper floor and 2nd upper floor, L/W approx. 103 m x 87.5 m, height up to approx. 17 m Metal ancillary building: consisting of basement, L/W approx. 18.5 m x 7.8 m, height up to approx. 5 m Waste and bicycle shelter ancillary building: consisting of ground floor, L/W approx. 17.1 m x 5.2 m, height up to approx. 3.5 m Heating building: consisting of 1st basement and 2nd basement, L/W approx. 16.75 m x 7.0 m, height up to approx. 8.5 m Wood/construction ancillary building: consisting of ground floor, L/W approx. 23.15 m x 7.35 m, height up to approx. 5.5 m Construction description: Structural shell: Basement, stairwell cores and central area/auditorium made of reinforced concrete, partly exposed concrete, remaining exterior and interior walls in timber construction, interior walls partly made of gypsum plasterboard, ceilings as timber-concrete composite floors Façades: Timber cladding with thermal insulation behind it Roof structure: Flat roof, partly greened Windows and exterior doors: - Metal construction - Timber-aluminium construction Sun protection: External venetian blinds Suspended ceilings: made of gypsum plasterboard building panels, partly as perforated gypsum plasterboard ceilings or timber acoustic ceilings with installations above Interior doors: - Steel frames with wooden door leaf - Aluminium-glass construction Floor coverings: Cement screed and coverings made of rubber, parquet and tiles with underfloor heating Paved outdoor areas: Asphalt surfacing and concrete paving Road construction works, Areas 1 and 2: - Supply and spread 605 m³ of topsoil - Excavate and dispose of 1,200 m³ of soil - 7,275 m³ earth formation - 605 m³ utility trench - 500 m infiltration pipe - 170 m drainage pipe DN 100-200 - 22 road gullies - 136 m drainage channel - 193 m reveal channel - 24 Schot covers D 400 - 4,000 m³ frost protection layer - 2,224 m³ asphalt base course - 280 m³ porous concrete base course - 2,224 m³ asphalt surface course - 627 m³ PU asphalt - 889 m³ concrete grass-joint paving - 2,800 m³ small granite sett paving - 300 m granite steps in external staircase - 1,357 m edging made of concrete and granite - 306 m³ reinforced-concrete floor slab D = 25 cm - 18 m³ reinforced-concrete foundations - 130 seating-concrete seating blocks Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.