Germany – Construction work for school buildings – GW 040 Heating construction work in accordance with DIN 18380 - Campus extension in 79618 Rheinfelden (Baden)
GW 040 Heating construction work in accordance with DIN 18380 - Campus extension in 79618 Rheinfelden (Baden) Scope of services: Supply and installation of a heating and cooling supply system in accordance with DIN 18380 for a timber-built school extension. Th
Opportunity description
GW 040 Heating construction work in accordance with DIN 18380 - Campus extension in 79618 Rheinfelden (Baden) Scope of services: Supply and installation of a heating and cooling supply system in accordance with DIN 18380 for a timber-built school extension. The heat supply is provided via a new district heating connection supplied by the client. Heating is provided primarily via underfloor heating surfaces with an area of approx. 1,300 m² and several manifolds housed in room walls. Interior areas such as toilet facilities are not heated. The heating surfaces are used for cooling in summer. Ventilation and floor surfaces are provided for cooling. Cooling is generated by an outdoor chiller using propane refrigerant. The underground supply lines will be provided by the client. Performance period: Expected start: 01.03.2027 (installation planning from 01.10.26) Expected completion: 08.01.2028 GW 040 Heating work in accordance with DIN 18380 - Campus extension in 79618 Rheinfelden (Baden) Scope of services: Supply and installation of a heating and cooling supply system in accordance with DIN 18380 for a timber-built school extension. The heat supply is provided via a new district heating connection supplied by the client. Heating is provided primarily via underfloor heating surfaces with an area of approx. 1,300 m² and several manifolds housed in room walls. Interior areas such as toilet facilities are not heated. The heating surfaces are used for cooling in summer. Ventilation and floor surfaces are provided for cooling. Cooling is generated by an outdoor chiller using propane refrigerant. The underground supply lines will be provided by the client. Performance period: Expected start: 01.03.2027 (installation planning from 01.10.26) Expected completion: 08.01.2028 Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.