Germany – Construction work for school buildings – Renovation of the 3rd Primary School, Magdeburger Straße 5, 01587 Riesa - Lot GS-17 Screed Works
Renovation of the 3rd Primary School, Magdeburger Straße 5, 01587 Riesa - Lot GS-17 Screed Works Lot GS-17 Screed: Substrate preparation, waterproofing works: • Site setup • Mill substrate, 10 mm – 1.000 m² • Mill substrate, surchar
Opportunity description
Renovation of the 3rd Primary School, Magdeburger Straße 5, 01587 Riesa - Lot GS-17 Screed Works Lot GS-17 Screed: Substrate preparation, waterproofing works: • Site setup • Mill substrate, 10 mm – 1.000 m² • Mill substrate, surcharge for additional thickness per 5 mm – 1.569 m² • Shot-blast substrate – 610 m² • Re-chisel base cove areas – 285 m • Separation cut in plaster, remove base plaster, h= 15 cm – 345 m • Repair plaster on base surfaces, h=15 cm – 345 m • Re-chisel small areas – 100 pcs • Clean substrate of existing floors – 3.300 m² • Levelling compound, d= 5 mm – 570 m² • Levelling compound, additional thickness per d= 5 mm – 150 m² • Cove at floor-to-wall transition – 1.005 m • Waterproofing with V60 S4 BA bitumen membrane – 1.687 m² • Form wall connections, bitumen membrane – 1.005 m • Form movement joint, bitumen membrane – 112 m Levelling and insulation layers: • Levelling compound, d= 5 mm – 601 m² • Levelling compound, additional thickness per d= 5 mm – 125 m² • Bonded fill, volcanic rock, d= 15 mm – 1.487 m² • Bonded fill, additional thickness per d= 5 mm – 124 m² • System edge strips, EPS, h= up to 150 mm – 1.400 m • System edge strips, MW, h= up to 100 mm – 2.130 m • PE film separating layer – 2.227 m² • EPS impact sound insulation, d= 10-2 and 20-2 mm – 281+1.748 m² • MW impact sound insulation, d= 12-2; 20-2 and 25-2 mm – 192+177+2.594 m² • EPS thermal insulation, d= 20-80 mm – 1.265 m² Cement screed: • Cement screed, CT-C35-F5-S50, 5kN/m2, d= 50 mm – 564 m² • Cement screed, CT-C35-F5-S60, 5kN/m2, d= 60 mm – 674 m² • Heated screed, CT-C35-F5-S85-H65, 5 kN/m2, d= 85 mm – 988 m² • Form openings and finishes at adjacent building components • Form dummy or butt joints as construction joints – 160 m • Movement/separation joint, mineral wool strips, in screed 10/50-85 mm – 255 m • Cure the screed with film to protect against drying out – 800 m² • Install entrance mat systems (supplied by the client) – 5 pcs Mastic asphalt screed: • Mastic asphalt screed AS-IC10-S35, d= 35 mm on corrugated cardboard – 2.837 m² • Mastic asphalt screed AS IC10-S35, surcharge for additional thickness per d= 5 mm – 1.155 m² • Form openings and finishes at adjacent building components • Form required edge restraints in doorway areas – 100 m • Subsequently make separation cuts or joint cuts in mastic asphalt screed – 150 m • Subsequently fill joints in mastic asphalt screed with sealing compound – 150 m Miscellaneous: • Working of small screed areas, up to individual area= 0,5 m² - 25 pcs • Moisture testing, CM method, screed – 10 pcs Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.