Germany – Construction work for swimming pool – Erlebnisbad Zeller Land - Lot 20 - Suspended ceilings
The Erlebnisbad Zeller Land was built approximately 45 years ago as a purely sports pool adjacent to the existing outdoor pool. In 1993, the indoor pool was expanded and the outdoor pool area was closed except for the children's paddling pool. Some a
Opportunity description
The Erlebnisbad Zeller Land was built approximately 45 years ago as a purely sports pool adjacent to the existing outdoor pool. In 1993, the indoor pool was expanded and the outdoor pool area was closed except for the children's paddling pool. Some areas of the pool are still original from 1974 and are therefore in a corresponding condition. Even the newer components from the 1990s already exhibit significant defects and signs of wear in the building structure and technical installations. This prompted the Zell an der Mosel collective municipality, as the operator of the pool, to commission a renovation study in 2019. The result of the study was that the entire roof structure, the existing post-and-beam façade, and all technical systems have reached the end of their service life and that renovating these areas would be uneconomical. For this reason, the client decided to demolish the indoor pool with the adjacent service buildings (catering facilities, residential building, etc.) and replace it with a new replacement building. Only the basement with the swimming pool (built in 1974) and part of the service buildings will remain. Environmental conditions: The Erlebnisbad Zeller Land is located on the outskirts of Zell-Kaimt, surrounded by sports facilities and vineyards in the immediate vicinity of the Moselle. Renovation of the Erlebnisbad Zeller Land Lot 20 - Suspended ceilings - approx. 1,718 m² wood-slat ceilings, 40/40 silver fir - approx. 450 cut-outs in wood-slat ceilings - approx. 850 m perimeter connections for wood-slat ceilings - approx. 245 m² wall cladding with wood slats - approx. 111 m² expanded-metal modular ceilings - approx. 132 cut-outs in expanded-metal modular ceilings - approx. 144 m perimeter connections for expanded-metal ceilings Procedure: open. Estimated value: 478,900 EUR. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.