Germany – Construction work for water projects – Replacement construction of bank reinforcement and ship landing stage
Description: Hydraulic engineering works, specialist civil engineering works, hydraulic steelwork, earthworks, wet dredging works - Dismantling of existing bank wall - Dismantling of existing bank reinforcement (stone pitching) - Dredging of groyne field - Sheet pile walls as toe protection s
Opportunity description
Description: Hydraulic engineering works, specialist civil engineering works, hydraulic steelwork, earthworks, wet dredging works - Dismantling of existing bank wall - Dismantling of existing bank reinforcement (stone pitching) - Dredging of groyne field - Supply and installation of sheet pile walls as toe protection - Construction of concrete beam for toe protection - Construction of sheet piles as land abutment for ship landing stage - Construction of an abutment for a ship landing stage, terrain retention by means of sheet pile wall including tie-back anchoring - Construction of slope protection by means of rockfill, stone pitching and interlocking revetment made of concrete blocks - Installation of angle retaining elements (precast reinforced concrete element) - Temporary construction dewatering - Structural steelwork to support walkway abutment, railings, brackets - Backfilling behind structure - Construction of reinforced earth - Restoration of surfaces up to the interface with the outdoor facilities construction project - Planning services and technical processing of the construction project; in particular - Updating/adaptation of execution documents for technically required construction stages (including stability verification), preparation of planning documents for pile-driving and excavation plans, workshop planning for structural steelwork, railings, paving layout plan, structural calculations for precast concrete elements and other temporary construction works,- Preparation of as-built documentation Scope of the work: - approx. 600 m³ demolition of bank wall - approx. 250 m² dismantling of existing bank reinforcement (stone pitching) - approx. 180 m dismantling of fencing - approx. 1,390 t demolition waste to be disposed of - approx. 3,700 m³ excavation - approx. 1,500 t excavated material to be disposed of - approx. 4,750 t excavated material to be temporarily stored on the contracting authority's storage area - approx. 3,000 m³ backfill material to be supplied and installed - approx. 120 m³ refilling - approx. 1,800 m² geotextile for reinforced earth - approx. 32 m concrete beam as toe abutment for revetment - approx. 40 m³ blinding concrete for concrete beam - approx. 125 t SPW sheet piles to be supplied - approx. 11 t SPW piles to be supplied - approx. 1,200 m² SPW profiles to be installed - 2 grouted anchors (length 12.50 m each) - approx. 105 m² corrosion protection to be applied - approx. 13 m³ infill concrete to be produced - approx. 36 m³ precast reinforced concrete angle retaining elements to be supplied and installed - approx. 47 m wall coping stones to be installed - approx. 360 oak piles, length 180 cm, to be supplied and installed - approx. 260 m² stone pitching LMB 40/200 to be constructed - approx. 750 m² vegetated rockfill LMB 10/60 to be constructed - approx. 165 m² interlocking revetment made of concrete blocks (30x30x18 cm) to be constructed - approx. 750 m³ wet dredging of groyne field, including disposal/recovery Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.