Germany – Construction work – L667 Hamm - ENB Lippe Bridges
Renewal of the three bridge structures along the L 667 over the Lippe, the Lippe side ditch and the Mühlengraben, and construction of a new footpath/cycle path alongside the roadway. The work put out to tender in the bill of quantities includes, among other things, fo
Opportunity description
Renewal of the three bridge structures along the L 667 over the Lippe, the Lippe side ditch and the Mühlengraben, and construction of a new footpath/cycle path alongside the roadway. The work put out to tender in the bill of quantities includes, among other things, the following main services: approx. 1,980 m3 demolition of structure (concrete and masonry) approx. 420 m bored piles approx. 2,240 m3 cast-in-place concrete approx. 470 t reinforcing steel approx. 460 t structural steel approx. 67 m angle retaining walls approx. 9,900 m2 asphalt pavement removal approx. 1,100 m protective and guiding equipment approx. 3,500 m3 frost protection layer (0/45) approx. 11,200 m2 asphalt base course approx. 6,300 m2 asphalt binder layer approx. 14,350 m2 asphalt surface course approx. 270 m2 construction of paved areas Traffic safety Execution documents Procedure: open. Estimated value: 11,000,000 EUR. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.