Germany – Construction work – Painting work - New extension building for Bungerhof Primary School
Filling of plastered surface to Q3 quality, approx. 1,700 m2 Nonwoven fabric on gypsum board as crack-bridging reinforcement, approx. 1,900 m2 Initial coating on interior wall surfaces, approx. 4,200 m2 Filling and coating of ceilings / undersides of stairs, approx. 90 m2 Coating of st
Opportunity description
Filling of plastered surface to Q3 quality, approx. 1,700 m2 Nonwoven fabric on gypsum board as crack-bridging reinforcement, approx. 1,900 m2 Initial coating on interior wall surfaces, approx. 4,200 m2 Filling and coating of undersides of ceilings / stairs, approx. 90 m2 Coating of stair and landing edge railings, approx. 15 m Coating of steel components, primed or galvanized, approx. 15 m2 Interior coating on steel enclosing frames, approx. 70 pcs. Coating on sheet-steel door as exterior door, double-leaf, approx. 2 pcs. Coating on copper and stainless-steel pipes, approx. 200 m Oil-pan coating of the elevator pit, approx. 10 m2 Protective film on vertical components such as windows and doors, approx. 400 m2 Elastic joint, width up to approx. 10 mm, approx. 1,300 m Scaffolding for surfaces to be worked on higher than 3.50 m psch Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.