Germany – Construction work – New construction of the Spitzenstein elevated reservoir / Kasdorf branch to the Bogel elevated reservoir - PB4 - Lot 09 - Civil engineering, pipeline construction and road construction works
The Nastätten Verbandsgemeindewerke are participating in the construction of the supra-regional elevated reservoir in the Oberbachheim district of the Loreley Verbandsgemeindewerke, in order to create an additional and replacement water supply for the Wint
Opportunity description
The Nastätten Verbandsgemeindewerke are participating in the construction of the supra-regional elevated reservoir in the Oberbachheim district of the Loreley Verbandsgemeindewerke, in order to create an additional and replacement water supply for the Winterwerb, Oberbachheim, Gemmerich, Himmighofen and Kasdorf supply areas. The Gemmerich and Schaarheck elevated reservoirs (HB) are to be connected to the planned supra-regional Spitzenstein elevated reservoir. In this context, a transmission pipeline will be laid, ultimately connecting the Spitzenstein elevated reservoir with the Bogel elevated reservoir. This measure will close a gap between sections of the transmission pipeline that have already been laid. New construction of the Spitzenstein elevated reservoir / Kasdorf branch to the Bogel elevated reservoir - PB4 Lot 09 - Civil engineering, pipeline construction and road construction works - Remove / replace topsoil approx. 105 m3 - Construct pipeline zone approx. 1,210 m3 - Trench excavation and removal approx. 1,360 m3 - Trench excavation surcharge, homogeneous area IV rock approx. 1,560 m3 - Temporarily store and reinstall trench excavation material approx. 1,980 m3 - Trench backfilling with replacement material approx. 150 m3 - Construct trench shoring approx. 5,680 m² - Drinking water pressure pipes DA 225 approx. 2,091 m - Cable protection conduit DA 50 approx. 2,100 m - Control cable approx. 2,100 m Procedure: open. Estimated value: 1,008,636 EUR. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.