Germany – Construction work – New Construction of the Falkensee Secondary School Sports Hall, Lot 20 Ventilation
Ventilation HVAC supply/exhaust air units with heat recovery (outdoor installation) 2 pcs. Split air-conditioning system set for IT area 1 pc. Ventilation unit with heat recovery (decentralized) 1 pc. Ventilation ceiling for commercial kitchen - system ceiling modules (CrNi, incl. splash-water-protected) ? 43 m2 Air ducts
Opportunity description
Ventilation HVAC supply/exhaust air units with heat recovery (outdoor installation) 2 pcs. Split air-conditioning system set for IT area 1 pc. Ventilation unit with heat recovery (decentralized) 1 pc. Ventilation ceiling for commercial kitchen - system ceiling modules (CrNi, incl. splash-water-protected) ? 43 m2 Air ducts/fittings, stainless steel, shield-gas welded (kitchen exhaust air) ? 115 m2 Air ducts/fittings, rectangular, galvanized steel, folded ? 816 m2 Cladding/fire-protection casing for ducts ? 62 m2 Round ducts, galvanized steel (DN80-DN315) ? 189 m Round fittings and connectors (bends, branches, transitions, sleeves, inspection pieces) ? 400 pcs. Flexible round aluminum ducts (DN80-DN250) ? 119 m F90 fire dampers (incl. cover plates) 7 pcs. Volume flow controllers (round + rectangular) ? 32 pcs. Silencers (round + rectangular) ? 38 pcs. Air outlets/grilles incl. connection boxes/mounting frames (workrooms, cafeteria, sanitary facilities)? 130 pcs. Weather protection grilles 4 pcs. Roof penetrations/hoods 6 pcs. 03 - Insulation Thermal insulation, mineral wool (D20-D50 mm) ? 360 m2 Sheet-metal cladding ? 185 m2 Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.