Germany – Construction work – New construction of the Falkensee Secondary School sports hall, Lot 21 - Electrical work
Electrical work: 100 kWp PV system, 1 main distribution board + 400A current transformer metering, 7 field distribution boards, approx. 500 installation devices, KNX control system, approx. 22,000m of cables/lines for electrical engineering/IT, 375 surface-mounted or recessed LED luminaires, emergency l
Opportunity description
Electrical work: 100 kWp PV system, 1 main distribution board + 400A current transformer metering, 7 field distribution boards, approx. 500 installation devices, KNX control system, approx. 22,000m of cables/lines for electrical engineering/IT, 375 surface-mounted or recessed LED luminaires, emergency lighting by means of a central battery system with 101 system luminaires and 33 monitoring modules integrated into general luminaires, isolated air-termination and down-conductor system (lightning protection), 3 call systems incl. UPS for accessible toilets, 2 natural smoke extraction systems (hall sections, 1x stairwell), technical installations in the outdoor area incl. service route to the school building, 4 bollard luminaires and cables/lines Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.