Germany – Construction work – New construction of the Mittenwalde road maintenance depot, lot for utility line construction and base course works
New construction of the Mittenwalde road maintenance depot, lot for utility line construction and base course works approx. 40 m PE-HD pipe 32 x 3.7 mm approx. 500 m² vegetation layer, 5cm, remove manually and dispose of approx. 3,600 t soil, AVV 170504, BM-0, excavate, load and dis
Opportunity description
New construction of the Mittenwalde road maintenance depot, lot for utility line construction and base course works approx. 40 m PE-HD pipe 32 x 3.7 mm approx. 500 m² vegetation layer, 5 cm, remove manually and dispose of approx. 3,600 t soil, AVV 170504, BM-0, excavate, load and dispose of approx. 360 m³ soil excavation for wastewater pipeline and manhole excavations, D up to 1.25 m, unsupported approx. 200 m³ subsoil improvement, STS, natural crushed stone 0/45 approx. 50 m³ gravel (16/32) for infiltration trenches, supply and install approx. 1,400 m³ frost protection layer, aggregate 0/45, RC-1 footnote 2 pursuant to EBV approx. 1 pc sedimentation system, reinforced concrete DN 3000, height approx. 3.24 m approx. 210 m solid-wall sewer pipe DN/OD 200, PP-HM, incl. bedding approx. 21 pcs leak-tightness testing, manhole DN 800 approx. 380 m telecommunications underground cable A2YL2Y 2X2X0.8qmm approx. 480 m² lay ready-grown turf, rolled utility lawn D 20mm W 400mm approx. 4 pcs install pumping system approx. 150 m PE-HD pipe 125x11.4 approx. 130 m pre-insulated local heating pipeline 125x11.4/200 approx. 50 m dry drilling approx. 430 m cable protection pipe OD 160mm Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.