Germany – Construction work – Drywall works in the old building
The GS Kestnerstr. is to be converted into an accessible, inclusive all-day school. The drywall works in the listed old building include, in addition to site setup, fire protection certification for timber and steel components, 620m² stud wall
Opportunity description
The GS Kestnerstr. is to be converted into an accessible, inclusive all-day school. The drywall works in the listed old building include, in addition to site setup, fire protection certification for timber and steel components, 620m² stud walls, as an additional item 380m² suitable for wet rooms, 160m² installation walls, 160m² wall linings, 30m boxed enclosures, 100m gypsum plasterboard reveals, 187 door openings, 355 wall recesses, 85m² self-supporting ceilings, 656m² self-supporting ceilings as substructures, 885m² long-span beam ceilings as substructures, 152m² suspended ceilings, 20 m² sloping dormer cladding, 590m² perforated-panel acoustic ceiling with 490m edge filling, 1520m² mineral-fibre suspended ceilings with mineral-wool overlay, 213m²/1.581m perimeter borders and 55 bulkheads, service-route cladding, cut-outs, cable penetrations and inspection openings, 230m curtain track. The GS Kestnerstr. is to be converted into an accessible, inclusive all-day school. The drywall works in the listed old building include, in addition to site setup, fire protection certification for timber and steel components, 620m² stud walls, as an additional item 380m² suitable for wet rooms, 160m² installation walls, 160m² wall linings, 30m boxed enclosures, 100m gypsum plasterboard reveals, 187 door openings, 355 wall recesses, 85m² self-supporting ceilings, 656m² self-supporting ceilings as substructures, 885m² long-span beam ceilings as substructures, 152m² suspended ceilings, 20 m² sloping dormer cladding, 590m² perforated-panel acoustic ceiling with 490m edge filling, 1520m² mineral-fibre suspended ceilings with mineral-wool overlay, 213m²/1.581m perimeter borders and 55 bulkheads, service-route cladding, cut-outs, cable penetrations and inspection openings, 230m curtain track. Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.