Germany – Construction work – Redesign of the Western City Entrance
Road construction: approx. 6,000 m² asphalt milling, remove approx. 2,900 m of curbstones, remove approx. 7,300 m² of concrete block paving, excavate and dispose of approx. 17,600 m³ of soil, approx. 4,800 m³ soil replacement, construct approx. 5,700 m³ FSS. construct approx. 12,500 m² STS h
Opportunity description
Road construction: approx. 6,000 m² asphalt milling, remove approx. 2,900 m of curbstones, remove approx. 7,300 m² of concrete block paving, excavate and dispose of approx. 17,600 m³ of soil, approx. 4,800 m³ soil replacement, construct approx. 5,700 m³ FSS. construct approx. 12,500 m² STS, lay approx. 5,600 m² of concrete block paving, supply and install approx. 3,700 m of curbstones, construct approx. 4,900 m² of asphalt base, binder and surface courses incl. mastic asphalt, demolish approx. 390 m³ of pedestrian underpass contaminated with asbestos and BTEX using black/white areas, supply and install approx. 60 m² of steel sheet-pile wall, construct approx. 27 m³ of natural stone masonry Sewer construction: approx. 1,000 m³ earth excavation for sewer trench, remove approx. 120 m of water pipeline, demolish approx. 155 m of masonry sewer, remove approx. 5 sewer manholes, lay approx. 148 m of SB pipes DN 1000, lay approx. 160 m of connection pipes DA 160, install approx. 26 wastewater inspection chambers DN 200, install approx. 3 precast concrete manholes up to DN 1500 Water pipeline construction: construct approx. 200 m³ of utility trench, remove approx. 90 m of water pipeline, backfill approx. 80 m³ of pipeline zone, install approx. 47 valve boxes. Comprehensive transport-planning and urban-development reorganization of the western city entrance in Bingen before the start of the 2029 Federal Garden Show, including demolition of a pedestrian underpass, construction of a roundabout, relocation of the "Fruchtmarkt" road incl. open spaces between the Nahe Bridge and the level crossing with redesign and visual enhancement, complete reconstruction of Gerbhausstraße between Freidhof and Fruchtmarkt and of Amtsstraße between Fruchtmarkt and Badergasse, redesign of the Gerbhaus parking lot, Laternenplatz and Freidhof, redesign of the Fruchtmarkt/Salzstraße level crossing with parts of Museumsstraße, barrier-free conversion of the ramps on both sides of the railway underpass in extension of Gerbhausstraße, renewal of the drainage sewer and water pipeline in Gerbhausstraße using open-cut construction. Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.