Germany – Demolition, site preparation and clearance work – New construction of accommodation area
Site grading work and construction of a replacement infiltration trench Construction site clearance/safeguarding - Clearing of rootstocks, staggered by diameter: approx. 400 units - Exploratory excavations: approx. 150 m3 Dismantling work - Gas pipeline, out of service: approx. 75 m - A
Opportunity description
Site grading work and construction of a replacement infiltration trench Construction site clearance/safeguarding - Clearing of rootstocks, staggered by diameter: approx. 400 units - Exploratory excavations: approx. 150 m3 Dismantling work - Gas pipeline, out of service: approx. 75 m - Old cables, bundles, out of service: approx. 80 m - Reinforced-concrete district heating duct with supply/return lines, insulated, with man-made mineral fiber remediation: approx. 50 m Site grading - Strip and reuse 5 cm vegetation layer: approx. 35,000 m2 - Remove and reuse 25 cm topsoil: approx. 10,500 m3 - Recompaction of fill area: approx. 14,500 m2 - Excavate and place soil, cut & fill: approx. 31,000 m3 Infiltration trench as a replacement structure - Stormwater pretreatment system as a sedimentation shaft, including earthworks: 1 unit - Stormwater modular infiltration trench system, approx. 48 m3 storage volume, including earthworks: 1 unit - Removal of stormwater pipeline, DN 300 vitrified clay, including earthworks: approx. 60 m - Removal of stormwater manhole, DN 1000, reinforced concrete, including earthworks: 3 units Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.