Germany – Demolition work – Demolition work, Package 2
General refurbishment of the West Cemetery, Baldustr. 28, 80637 Munich, 10th city district, Moosach, Part 2 - Depot VE: Demolition work, Package 2 Complete demolition of social building, basement, ground floor, attic Floor area 27 x 8 m, volume approx. 1815 m³ - Gutting:
Opportunity description
General refurbishment of the West Cemetery, Baldustr. 28, 80637 Munich, 10th city district, Moosach, Part 2 - Depot VE: Demolition work, Package 2 Complete demolition of social building, basement, ground floor, attic Floor area 27 x 8 m, volume approx. 1815 m³ - Gutting: 324 m² tiled roof, 324 m² timber roof truss, 42 wooden windows and doors (waste wood category IV) - Tiles 171 m² wall, 309 m² floor - Heating pipes 365 m, ventilation 5 m² and 30 m, sanitary pipes 280 m and inventory - 1 electrical distribution cabinet, 600 m electrical cable, 30 lights - Floor structures: 179 m² floating screed with split tiles, stoneware tiles and 31 m² PVC - 146 m² plasterboard ceilings - 25 m steel railings, 14 m handrails, 32 window grilles and 3 door grilles - 15 WC´s/urinals, 9 washbasins, 1 kitchen sink - Clearance - Hazardous-material disposal: - Asbestos in pipe flanges, 22 radiators, 5 chimney doors, 7 fire doors - Man-made mineral fibres in 460 m of pipe insulation, behind roof cladding, 161 m² - Basement waterproofing 58 m² - Screed coatings 323 m² - Demolition: brick and concrete walls, concrete ceilings, walls and foundations, concrete staircase -- Complete demolition of equipment shed, basement + ground floor Floor area approx. 5 x 12.50 m; height approx. 6–7 m - Gutting: 2 m² wall tiles, wooden shed roof and wall, 75 m² zinc covering - Heating, sanitary installations; pipes approx. 40 m, 2 floor drains - 1 steel staircase, and 4 m handrails - Clearance - Hazardous-material disposal: - Asbestos in pipe flanges, 3 chimney doors - Man-made mineral fibres in pipe insulation, 30 m - Demolition: brick walls, concrete ceilings, walls and foundations Complete demolition of wooden sheds, ground floor, 2 units Floor area 9 x 4 m and 30 x 3 m - Wooden walls, wooden monopitch roof - 55 m² zinc covering - 90 m² bituminous roofing Complete demolition in outdoor areas - Concrete floors approx. 3 m² - Asphalt floors approx. 6 m² - Underground oil tank with 43 m of piping, capacity 20,000 l - 13 precast manholes DN 1000–DN 2000 Earthworks: - Clearing of construction areas 1700 m² - Excavation for demolition work, basement 1300 m³ - Remove topsoil approx. 2000 m² Disposal of uncontaminated and contaminated material Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.