Germany – Demolition work – B 184 Replacement construction of the Zerbster Bridge over DB InfaGo tracks in Roßlau - Demolition
B 184 Replacement construction of the Zerbster Bridge over DB InfaGo tracks in Roßlau - Demolition Construct steel sheet pile walls: 900 m² of sheet pile wall area, comprising: - 310 m² with sheet pile length 6-9 m - 180 m² with sheet pile length 9-12 m - 410 m² with sheet pile length 12-15 m
Opportunity description
B 184 Replacement construction of the Zerbster Bridge over DB InfaGo tracks in Roßlau - Demolition Construct steel sheet pile walls: 900 m² of sheet pile wall area, comprising: - 310 m² with sheet pile length 6-9 m - 180 m² with sheet pile length 9-12 m - 410 m² with sheet pile length 12-15 m Micropiles including test piles and tests: 930 m / 64 units regular micropiles, comprising: - Ø 195 mm: 860 m / 57 units - Ø 135 mm: 70 m / 7 units additionally 98 m / 10 units test piles and 10 load tests Structural concrete demolition: 1,224 m³ reinforced concrete, comprising: - Retaining wall: 293 m³ - Superstructure: 360 m³ - Wings: 128 m³ - Abutments: 443 m³ Crane operations: 2 work packages, comprising: - Lifting out the superstructure - Lifting out the east and west abutments Tamping and track alignment work: provide a tamping crew for 5 days Retamp/align 160 m of track Survey 160 m of track position 1 shift with tamping and aligning machine 5 t bedding material Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.