Germany – Drain-laying work – Leipzig University, Veterinary Medicine, Institute of Pathology, Complete Refurbishment
Waste disposal systems - Interim Section • approx. 165 m of double-walled plastic underground pipe DN 100-150 • 9 measuring connections on underground pipes for monitoring • 10 double-walled safety floor drains • 1 utility feedthrough • 6 fire
Opportunity description
Waste disposal systems - Interim Section • approx. 165 m of double-walled plastic underground pipe DN 100-150 • 9 measuring connections on underground pipes for monitoring • 10 double-walled safety floor drains • 1 utility feedthrough • 6 firestop seals • approx. 36 m of PE pipe DN 50-100 • 1 vacuum leak detection system, including manifolds • approx. 130 m of suction and measuring lines, including condensate vessels • 9 pipe connection installation kits • 7 hygienic box channels, width 200 mm • 3 top pieces for safety floor drains • 10 bell-type odor traps • 1 walk-through disinfection basin, including electric shut-off valve • 2 ventilation sterile filters and branch ventilators • Frost-protection trace heating All components include the services described in the bill of quantities. Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.