Germany – Earthmoving work – Renovation and expansion of Fire and Rescue Station 1 - construction phases 2+3, E.-Schlesinger-Str. 24, 18059 Rostock - Lot 63 Traffic and outdoor facilities
On the premises at Erich-SchIesinger-Str. 24, Fire and Rescue Station 1, built in 1983, is being renovated and expanded. The construction project is divided into four construction phases, with the work in construction phases 0 and 1 lar
Opportunity description
On the premises at Erich-SchIesinger-Str. 24, Fire and Rescue Station 1, built in 1983, is being renovated and expanded. The construction project is divided into four construction phases, with the work in construction phases 0 and 1 largely completed. In the further course of construction, construction phases 2 (rescue service) and 3 (volunteer fire brigade and civil protection) are now to begin. The two building sections, construction phase 2 and construction phase 3, each consist of separate single-story vehicle halls and adjoining two-story functional buildings housing the sanitary, social, lounge and office rooms. The construction phase 3 building has a 3rd floor in the northeast of the building, which accommodates the training and fitness rooms together with ancillary rooms and the ventilation control center. The construction phase 2 building has a 2nd upper floor on the south side as a technical control center. Specifically, the work includes, among other things, stormwater - 12 manholes DN 1000 - 27 m sewer B DN 400 - 270 m sewer PP DN 150 - 116 m retention channel 520 - 160 m channel DN 200 - 175 m channel DN 150 - 18 m channel DN 100 Wastewater - 6 manholes DN 1000 - 1 manhole DN 600 - 1 light-liquid separator NS 15 - 1 light-liquid separator NS 3 - 1 grease separator NS 4-800 with pumping station - 1 pressure interruption chamber DN 600 - 3 sampling chambers - 1 cistern for disinfection chamber DN 1500 - 120 m PP DN 200 - 90 m PP DN 150 Empty cable conduit system - 7 cable pulling chambers - 8 core drillings for PVC DN 150 - 1,350 m PVC DN 150 Traffic facilities - 5,000 m² concrete surface Bk3.2 with HGT - 1,950 m² asphalt surfaces Bk3.2 and Bk1.0 - 750 m² paved surfaces Bk1.0 - 430 m² paved sidewalk surfaces - 3 bicycle shelters - 1,300 m curbs - 8 block steps 100 and 50 cm - 3 retaining wall angle elements 80 - 5 retaining wall angle elements 55 - 1 one-piece 90° retaining wall corner element - 82 bollards Ø 160 mm - 8 corner collision protection elements Outdoor facilities - 1,500 m² lawn areas - 3,500 ground-cover plants “Vinca minor ‘Alba’” - 11 tree plantings 16/18 columnar oak / pyramidal oak Procedure: open. Estimated value: 30,000,000 EUR. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.