Germany – Electrical engineering installation works – Energy renovation of the Kleinenbremen visitor mine and museum - measurement and control technology
Energy renovation of the Kleinenbremen visitor mine and museum - measurement and control technology The Minden-Lübbecke district will remodel and carry out an energy renovation of the Kleinenbremen visitor mine and museum (BBMK) in order to bring the property up to a
Opportunity description
Energy renovation of the Kleinenbremen visitor mine and museum - measurement and control technology The Minden-Lübbecke district will remodel and carry out an energy renovation of the Kleinenbremen visitor mine and museum (BBMK) in order to bring the property up to a current technical standard. The “Kleinenbremen Visitor Mine and Museum” (BBMK) is the only authentically preserved iron ore mine and museum in the Westphalia region. The buildings on the property were constructed between 1935 and 1938 and reflect the architecture and industrial style of that period. Mining operations themselves remained active through 1957 inclusive and thus played a significant role in the regional economy and culture. Today, interested visitors can not only tour the historical sites but also learn more about mining techniques and challenges. The BBMK is therefore an important place for education and remembrance of the history of mining in Westphalia. Due to its entry in the list of protected monuments (No. 0175), all parts of the buildings are subject to ensemble monument protection, which covers both the exterior and interior design. Since 1988, the property has been used as a museum with an attached workshop as well as storage and exhibition areas. A hazardous substances report has been prepared. This must be taken into account and observed during the works. The renovation measure initially includes demolition, gutting and dismantling works in the building, which has a total of 3 floors. The scope of this invitation to tender comprises all works required for the heating supply systems trade. When disposing of the construction debris, the transport routes from the removal site to the entrances and exits for disposal must be taken into account. Work and storage areas: Work and storage areas, as well as areas for the construction site facilities, are planned outdoors. Parking spaces: A large visitor car park adjoins the museum, part of which will be reserved for construction vehicles. Construction power: The construction power supply will be provided externally by the contracting authority through a specialist company. After completion of all works, the entire remodeling area must be carefully left swept clean. All areas required for the immediate construction site must be prepared by the contractor at its own expense. The areas must be coordinated with the contracting authority and the construction management and left clean again after completion of the works. Approximate quantities for publication: 2 units switchgear 140 units data points 86 units field devices Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.