Germany – Electrical engineering installation works – Reutlingen, University of Applied Sciences, Building 22, Replacement Building for the Faculty of Applied Chemistry, Electrical, High- and Low-Voltage Systems
Electrical, high- and low-voltage systems 3.400 m cable trays 500 m installation duct 68 km cables and wiring 80 km data and fiber-optic cables 2.400 pcs. KNX installation devices, push buttons and sockets 650 pcs. data outlets 1.200 pcs. luminaires and em
Opportunity description
Electrical, high- and low-voltage systems 3.400 m cable trays 500 m installation duct 68 km cables and wiring 80 km data and fiber-optic cables 2.400 pcs. KNX installation devices, push buttons and sockets 650 pcs. data outlets 1.200 pcs. luminaires and emergency luminaires 1 pc. emergency lighting system with central battery 4 pcs. substations for emergency lighting 5 pcs. WC emergency call systems 1 pc. door intercom system 5 pcs. RWA 3 pcs. RAS systems 1 pc. BMA 60 pcs. manual fire alarm call points 450 pcs. multi-sensor detectors 340 pcs. optical signaling devices 26 pcs. sub-distribution boards 2 pcs. main building distribution boards (AV and SV) 1 pc. medium-voltage switchgear 10 kV 500 m medium-voltage cable 2 pcs. building transformers 1.250 kVA lightning protection and grounding system construction power and construction lighting BOS radio system Procedure: open. Estimated value: 3,873,415.14 EUR. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.