Germany – Electrical fitting work – Electrical installation work, telecommunications and high-voltage systems
Fire Station 1, An der Hauptfeuerwache, renovation, conversion and extension; VE: Electrical installation work, telecommunications and high-voltage systems - 1 NSHV - 2 building main distribution boards, - 25 sub-distribution boards - approx. 5,500 m of main and rise
Opportunity description
Fire Station 1, An der Hauptfeuerwache, renovation, conversion and extension; VE: Electrical installation work, telecommunications and high-voltage systems - 1 NSHV - 2 building main distribution boards, - 25 sub-distribution boards - approx. 5,500 m of main and riser cables - approx. 62,000 m of circuit cables - approx. 80 coarse, medium and fine surge protection devices - approx. 2,000 m of cable trays - approx. 300 m of electrical installation ducting - approx. 2,500 m of electrical installation conduit - approx. 83,000 m of Cat 7 data cables - approx. 1,300 m of coaxial cables - approx. 8,000 m of fire alarm cables - approx. 13,000 m of low-voltage cables - approx. 5,700 m of fiber-optic cables - approx. 2,800 switches, sockets - approx. 1,500 luminaires - approx. 460 smoke detectors/signaling devices/manual fire alarm call points - 15 IP intercom stations - 10 BK connection sockets - 25 IP clocks - approx. 360 loudspeakers on the electroacoustic system - 10 video cameras - 2 barrier systems - Stationary UPS system - Fire protection measures Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.