Germany – Electrical fitting work – General renovation of Reutlingen Town Hall (GRR), Building Section A, Advance Roof Renovation - Electrical Engineering
Electrical engineering dismantling work and new installations in several stages, carried out at intervals. - Dismantling of the lights on the 2nd floor - Dismantling of the lights on the 1st floor - Inspection and tracing of the electrical wiring as well as clear
Opportunity description
Electrical engineering dismantling work and new installations in several stages, carried out at intervals. - Dismantling of the lights on the 2nd floor - Dismantling of the lights on the 1st floor - Inspection and tracing of the electrical wiring as well as clear labeling of the circuits - Rerouting or new installation of the wiring prior to dismantling the existing ventilation ducts - Dismantling or rerouting of all wiring that obstructs the upcoming renovation of the roof structure - Proper securing of the supply lines as well as the cables for the lighting control, sun protection, and sockets - Dismantling of the existing cable trays as required The lights will be reinstalled after completion of the renovation work on the roof and installation of new ventilation systems (in approx. 10-12 months). Cable installation for the HVAC / instrumentation and control trades is work to be performed by the client and is not to be included in the project. Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.