Germany – Electrical fitting work – District Administration of the Darmstadt-Dieburg District -Darmstadt District Office, Wings 1 + 2-
Conversion of the power supply The power supply in the district administration must be renewed. The conversion work and replacement of the associated switchgear, including the cable reconnection work, are to be carried out during ongoing operations. In
Opportunity description
Conversion of the power supply The power supply in the district administration must be renewed. The conversion work and replacement of the associated switchgear, including the cable reconnection work, are to be carried out during ongoing operations. As part of the renewal of the switchgear, structurally separate operating rooms will be constructed for the AV and SV systems. The new operating rooms are to be equipped accordingly with new general electrical installations (lighting, switches, sockets, etc.). A total of four new switchgear installations are to be constructed. Procedure: open. Estimated value: 1,383,293.95 EUR. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.