Germany – Electrical fitting work – High-voltage and telecommunications systems
S-system with two transformers, each 2 MVA 2 generator sets, each 2 MW 2 UPS systems, 400 kVA/600 kVA LV switchgear, AV, SV and UPS network Central safety lighting with approx. 30 UVs Approx. 200 EUVs PV system approx. 270 kWp Approx. 5,000 luminaires Approx. 180 m S
Opportunity description
S-system with two transformers, each 2 MVA 2 generator sets, each 2 MW 2 UPS systems, 400 kVA/600 kVA LV switchgear, AV, SV and UPS network Central safety lighting with approx. 30 UVs Approx. 200 EUVs PV system approx. 270 kWp Approx. 5,000 luminaires Approx. 180 m busbars 3,200 A Approx. 1,500 m ring earth electrode, approx. 4,000 m down conductors In-house radio cell as SISO-DAS system, 2 network operators Approx. 90 WLAN access points, approx. 9x24-port access switches PoE+ Nurse call system for approx. 6 rooms IP door intercom system, approx. 5 intercom stations as an extension of the telecommunications system provided by the client Hearing assistance system with approx. 3 loops 2 NTP time servers, approx. 8 NTP secondary clocks PoE SAT-IF system using optical transmitters, approx. 12 coaxial connections BOS radio system according to the with 2 control centers, optical distribution technology, approx. 1,300 m leaky feeder cable Intrusion detection system, 6 VdS-C control centers, approx. 20 areas Approx. 43 km of cables for the fire alarm system with functional integrity Approx. 13 SUVs Approx. 12 km of CAT 7 data cables Approx. 43 km of fiber-optic cables Approx. 240 double outlets, approx. 20 single outlets Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.