Germany – Electrical installation work – Electrical engineering for the House of Education - IHK Ulm
Installation and commissioning of the electrical systems, cable and line laying, installation of the electrical components, control and safety technology, as well as all testing and documentation work New construction of training center Gross floor
Opportunity description
Installation and commissioning of the electrical systems, cable and line laying, installation of the electrical components, control and safety technology, as well as all testing and documentation work New construction of training center Gross floor area (GFA): approx. 3,329 m² Gross volume (GV): approx. 13,085 m³ Floors: 6 incl. basement Main dimensions: L/W basement 28.05 / 22.05 m L/W ground floor 28.05 / 22.05 m L/W 1st floor 28.05 / 22.05 m L/W 2nd floor 28.05 / 22.05 m L/W 3rd floor 28.05 / 22.05 m L/W 4th floor 28.05 / 22.05 m L/W attic floor 3.20 / 2.80 m Parapet height above 4th floor 18.98 m Parapet height above attic floor 22.50 m Floor height 1st basement 3.10 m on average Floor height ground floor 3.36 m on average Floor height 1st floor 3.00 m on average Floor height 2nd floor 3.00 m on average Floor height 3rd floor 3.00 m on average Floor height 4th floor 3.00 m on average Floor height attic floor 3.00 m on average Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.