Germany – Electrical installation work – IAA Bielatal - Construction of settling basins to reduce arsenic input into the Biela - Process engineering (Lot 2) and electrical/instrumentation and control technology (Lot 3)
Lot 2 - Process engineering - Treatment of mining seepage water as a redundant system in various concrete basins with the aim of reducing the arsenic content in the seepage water; Lot 3 - Electrical/instrumentation and control technology - central power supply for al
Opportunity description
Lot 2 - Process engineering - Treatment of mining seepage water as a redundant system in various concrete basins with the aim of reducing the arsenic content in the seepage water; Lot 3 - Electrical/instrumentation and control technology - central power supply for all equipment, machinery and devices; Further details can be found in the procurement documents. Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.