Germany – Electrical machinery, apparatus, equipment and consumables; lighting – Replacement construction of the State Vocational School in Regen with FOS: Training system for electric vehicles
Brief description Building dimensions: Main school building: consisting of basement, ground floor, 1st floor and 2nd floor, L/W approx. 103 m x 87.5 m, height up to approx. 17 m Metal outbuilding: consisting of basement, L/W approx. 18.5 m x 7.8 m, height up to approx. 5 m Waste and bicycle shelter outbuilding: consisting of ground floor, L/W approx. 17.1 m x 5.2 m, height up to approx. 3.5 m Heating building: consisting of 1st basement and 2nd basement, L/W approx. 16.75 m x 7.0 m, height up to approx. 8.5 m Wood/construction outbuilding: consisting of ground floor, L/W approx. 23.15 m x 7.35 m, height up to approx. 5.5 m Construction description: Structural shell: basement, stairwell cores and central area/auditorium made of reinforced concrete, partly exposed concrete, remaining exterior and interior walls of timber construction, interior walls partly made of gypsum plasterboard, ceilings of timber-concrete composite construction Facades: timber cladding with thermal insulation behind it Roof construction: flat roof, partly greened Windows and exterior doors: - Metal construction - Timber-aluminium construction Sun protection: external venetian blinds Suspended ceilings: made of gypsum plasterboard panels, partly as perforated gypsum plasterboard ceilings or timber acoustic ceilings with installations above Interior doors: - Steel frames with wooden door leaf - Aluminium-glass construction Floor coverings: cement screed and coverings made of rubber, parquet and tiles with underfloor heating Paved outdoor areas: asphalt surfacing and concrete paving 1 training system for electric vehicles Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Opportunity description
Brief description Building dimensions: Main school building: consisting of basement, ground floor, 1st floor and 2nd floor, L/W approx. 103 m x 87.5 m, height up to approx. 17 m Metal outbuilding: consisting of basement, L/W approx. 18.5 m x 7.8 m, height up to approx. 5 m Waste and bicycle shelter outbuilding: consisting of ground floor, L/W approx. 17.1 m x 5.2 m, height up to approx. 3.5 m Heating building: consisting of 1st basement and 2nd basement, L/W approx. 16.75 m x 7.0 m, height up to approx. 8.5 m Wood/construction outbuilding: consisting of ground floor, L/W approx. 23.15 m x 7.35 m, height up to approx. 5.5 m Construction description: Structural shell: basement, stairwell cores and central area/auditorium made of reinforced concrete, partly exposed concrete, remaining exterior and interior walls of timber construction, interior walls partly made of gypsum plasterboard, ceilings of timber-concrete composite construction Facades: timber cladding with thermal insulation behind it Roof construction: flat roof, partly greened Windows and exterior doors: - Metal construction - Timber-aluminium construction Sun protection: external venetian blinds Suspended ceilings: made of gypsum plasterboard panels, partly as perforated gypsum plasterboard ceilings or timber acoustic ceilings with installations above Interior doors: - Steel frames with wooden door leaf - Aluminium-glass construction Floor coverings: cement screed and coverings made of rubber, parquet and tiles with underfloor heating Paved outdoor areas: asphalt surfacing and concrete paving 1 training system for electric vehicles Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.