Germany – Electrical wiring and fitting work – HWE_(Heating-Water-Electrical greenhouse and operations hall)
Electrical system without transformer, but including, among other things, distributor, computer + heating with propane boiler (without ~house, without wood-fired boiler) and with lifting pipe-rail heating systems + water without water basin, but with silos, containers, lines and pipes, all for a pro
Opportunity description
Electrical system without transformer, but including, among other things, distributor, computer + heating with propane boiler (without ~house, without wood-fired boiler) and with lifting pipe-rail heating systems + water without water basin, but with silos, containers, lines and pipes, all for a production greenhouse. The systems for the heating, water (supply) and electrical trades are to be supplied and installed primarily in the greenhouse to be constructed and the adjacent operations hall. Furthermore, a propane boiler is to be installed in the boiler house. Specific requirements for production greenhouses apply to everything, with which the contractor should be familiar. Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.