Germany – Engineering design services for mechanical and electrical installations for buildings – 70-00511-2370-E ELT - PR1227703-2370-B
Specialist planning of technical equipment As part of the specialist planning of technical equipment, a concept for the technical infrastructure of the Stuttgart Climate Tech Hub (S-CTH) will be developed, including possible expansions. The existing parking gar
Opportunity description
Specialist planning of technical equipment As part of the specialist planning of technical equipment, a concept for the technical infrastructure of the Stuttgart Climate Tech Hub (S-CTH) will be developed, including possible expansions. The existing parking garage at the Fraunhofer Institute Center Stuttgart (IZS) is currently not fully serviced, so comprehensive technical infrastructure measures are planned. In particular, the installation of a fire alarm system as well as a photovoltaic system and PVT—photovoltaics and solar thermal energy in a hybrid module on the roof is planned. Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.