Germany – Engineering design services for the construction of civil engineering works – Renovation of sports and multipurpose hall
Renovation of sports and multipurpose hall, roof of indoor swimming pool Technical equipment, ELT Renovation of sports and multipurpose hall, roof of indoor swimming pool The existing multipurpose hall (indoor swimming pool and sports hall) is a central public facility fo
Opportunity description
Renovation of sports and multipurpose hall, roof of indoor swimming pool Technical equipment, ELT Renovation of sports and multipurpose hall, roof of indoor swimming pool The existing multipurpose hall (indoor swimming pool and sports hall) is a central public facility for school and club sports as well as for other community uses in the municipality. It was constructed in 1977. The hall is regularly used by several local clubs, such as the gymnastics, cycling, football, model sports, and music clubs, etc., as well as for school sports, and is occupied on all days of the week (Monday-Friday from 7:00 a.m.-11:30 p.m.). There is therefore a high quantitative need for the hall to remain permanently usable as an important component of the municipal infrastructure. During ongoing use, considerable structural and technical deficiencies have become apparent, making renovation absolutely necessary. In particular, the current fire safety requirements are not met. Additional requirements for BMA and ELA exist. This poses a significant risk to the safe operation of the hall and already restricts its possible uses. The roofs of the entire complex comprising the multipurpose hall, indoor swimming pool, and foyer are severely leaky, resulting in moisture ingress. This affects both the building fabric and the safe use of the hall and causes further damage to the building. Inside, nearly all wastewater pipes are leaking and damaged, which is no longer acceptable from a structural, hygienic, or environmental perspective. Furthermore, accessibility is not fully provided. Measures are therefore also required in this area. In terms of quality, the multipurpose hall in its current condition therefore no longer meets today’s requirements for safety, functionality, accessibility, and sustainable operation. Renovation is urgently required to ensure proper and safe operation, prevent consequential damage, and preserve the hall in the long term as a central sports and meeting venue for schools, clubs, and the public. The roof of the sports hall, including the supporting structure, must be completely dismantled and rebuilt. The hall floor is also to be removed and reinstalled; the stands and walls are to be retained and must therefore be protected during the construction work. The sports hall and indoor swimming pool will be revised in terms of fire safety and adapted to the existing requirements of the LRA. Since all buildings are supplied by a shared heating system, a temporary system must be provided for the duration of the construction period. No renovations will be carried out in the interior finishing (such as showers, toilets, or changing rooms). These have already been renewed and are therefore not part of the measure. However, the wastewater pipes must be renewed. The underground pipes in the outdoor area must also be inspected and, if necessary, renovated. The ventilation system has already been renewed; as part of the measures, it must be dismantled, stored, and subsequently reinstalled and connected. The same applies to the solar installations on the roofs of the foyer, connecting structure, and indoor swimming pool. The roofs also exhibit leaks. These are likewise to be dismantled and renewed. A roof shape that prevents standing water must be provided. In addition, measures to improve accessibility must be implemented. During the renovation of the multipurpose hall, attention will be paid to the use of sustainable, durable, and resource-efficient building materials. Materials will be used that support high energy efficiency, minimize environmental impact, and ensure a long service life. In addition, recyclability, environmental compatibility, and low emissions will be considered when selecting construction materials. This approach helps reduce the ecological footprint of the renovation measures and maintain the hall sustainably over the long term. Procedure: neg-w-call. Estimated value: 80,000 EUR. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.