Germany – Engineering design services – Drinking Water Study, TA 3
Planning of the drinking water supply pipeline from the Merbitz - Krosigk branch and from the Haltberg elevated reservoir - Petersberg municipal boundary toward the Nauendorf pressure boosting station - Planning of the drinking water supply pipeline from the Haltberg elevated reservoir (HB) to the pressure boostin
Opportunity description
Planning of the drinking water supply pipeline from the Merbitz - Krosigk branch and from the Haltberg elevated reservoir - Petersberg municipal boundary toward the Nauendorf pressure boosting station - Planning of the drinking water supply pipeline from the Haltberg elevated reservoir (HB) to the Nauendorf pressure boosting station (DE) within the Petersberg municipal boundary and from the Merbitz branch to Krosigk (06193 Petersberg) The WAZV Saalkreis wishes to renovate its drinking water supply network to improve energy efficiency and, in this context, intends, as a subproject of the overall "Optimization of the Drinking Water Supply Network" project, to install a drinking water supply pipeline from Merbitz to Krosigk and from the Haltberg elevated reservoir to the Nauendorf pressure boosting station. The route section runs from the Haltberg elevated reservoir to the Nauendorf pressure boosting station within the Petersberg municipal boundary and from the Merbitz branch to Krosigk. The planned route length is approximately 3,260 m. Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.