Germany – Engineering design services – Drinking Water Study, TA 1
Planning of the drinking water supply pipeline from AGS Löbejün-Nauendorf to DE Nauendorf - Planning of the drinking water supply pipeline from the transfer station (AGS) Löbejün-Nauendorf via the elevated reservoir (HB) Haltberg to the pressure booster
Opportunity description
Planning of the drinking water supply pipeline from AGS Löbejün-Nauendorf to DE Nauendorf - Planning of the drinking water supply pipeline from the transfer station (AGS) Löbejün-Nauendorf via the elevated reservoir (HB) Haltberg to the pressure booster station (DE) Nauendorf (06193 Wettin-Löbejün) WAZV Saalkreis would like to upgrade its drinking water supply network to improve its energy efficiency and, in this context, intends, as a subproject of the overall project "Optimization of the Drinking Water Supply Network," to install a drinking water supply pipeline from the Löbejün-Nauendorf transfer station via the Haltberg elevated reservoir to the Wettin-Löbejün / Petersberg municipal boundary (Subsection 1). The pipeline route area is located within the Wettin-Löbejün cadastral district and extends over 2 sections: Section 1 runs from the Löbejün-Nauendorf transfer station in a westerly or southwesterly direction via the Haltberg elevated reservoir to the Wettin-Löbejün / Petersberg municipal boundary. Section 2 runs from the Wettin-Löbejün / Petersberg municipal boundary in a southwesterly direction to the Nauendorf pressure booster station. The planned route length is approximately 5,440 m. Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.