Germany – Engineering design services – Drinking Water Study, Subsection 4
Design of the drinking water supply pipeline from Zaschwitz to Wils - Design of the drinking water supply pipeline from the locality of Zaschwitz to the locality of Wils (06198 Salzatal) The WAZV Saalkreis wishes to upgrade its drinking water supply network for improved energy
Opportunity description
Design of the drinking water supply pipeline from Zaschwitz to Wils - Design of the drinking water supply pipeline from the locality of Zaschwitz to the locality of Wils (06198 Salzatal) The WAZV Saalkreis wishes to upgrade its drinking water supply network for improved energy efficiency and, in this context, intends to lay a drinking water supply pipeline from the locality of Zaschwitz to the locality of Wils (subsection 4) as a subproject of the overall project "Optimization of the Drinking Water Supply Network". The route area runs from the Salzatal/Wettin-Löbejün municipal boundary via the existing Zaschwitz pressure boosting station (DE), through Fienstedt to the Gorsleben connection point and then to the Wils connection point. Outside the localities, the route runs along agricultural roads or field tracks and arable land, with part of it laid in state road L156. Within the locality of Gorsleben, the route runs in the paved carriageway area, with part of it laid in state road L156 and state road L159. The planned route length is approximately 7,950 m. Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.