Germany – Engineering services – Object planning for transport facilities
Object planning for transport facilities The A73 is to be upgraded as part of a comprehensive maintenance measure to the currently applicable standard cross-section RQ 31 in accordance with RAA, in order, among other things, to ensure 4+0 traffic routing for future construction measures
Opportunity description
Object planning for transport facilities The A73 is to be upgraded as part of a comprehensive maintenance measure to the currently applicable standard cross-section RQ 31 in accordance with RAA, in order, among other things, to ensure 4+0 traffic routing for future construction measures. In addition, the road section must be assessed for compliance with guidelines and for any existing route-planning deficiencies in horizontal and vertical alignment in accordance with RAA, as well as with regard to the pavement structure in accordance with RStO 12 (deficit analysis), and redesigned. As part of the maintenance measure, the existing noise protection must be reviewed in terms of both location and height. Possible dismantling and replacement measures, whether as an embankment, wall, or embankment-wall combination, must be taken into account accordingly in the planning. The entire planning contract comprises services from several service profiles: - Object planning for transport facilities - Surveying services The planning services for the object planning of transport facilities comprise the following parts: - Route planning (excluding structures) as well as project-wide services Drainage planning (stormwater disposal including stormwater treatment facilities - Integration of results from noise protection calculations into the route planning - Integration of results from landscape planning into the route planning - Integration of the 6 replacement bridge structures Route planning for the temporary widening of the road and all structures (bridges, retaining walls, noise protection embankments and walls, etc.) in one direction of travel for the 4+0 traffic routing Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.