Germany – Engineering works and construction works – A7, noise barriers, route + structure
A7 replacement construction of the Uttrichshausen valley bridge, A7, noise barriers, route + structure, route noise barriers (structures 4, 5, 6 and NW) and bridge noise barriers (structures 2 and 3) (direction of travel Kassel + Würzburg): Noise barriers H = 5,0m, L(total) = approx. 2.255m, partly on the structure, p
Opportunity description
A7 replacement construction of the Uttrichshausen valley bridge, A7, noise barriers, route + structure, route noise barriers (structures 4, 5, 6 and NW) and bridge noise barriers (structures 2 and 3) (direction of travel Kassel + Würzburg): Noise barriers H = 5,0m, L(total) = approx. 2.255m, partly founded on the structure, partly on bored piles in the route area. Wall elements made of reinforced concrete or acrylic glass Main dimensions: • Total length / height (route noise barriers): 414 m / 5,00 m • Total length / height (bridge noise barriers): 1.840,50 m / 5,00 m Main quantities: • Earthworks (excavation) - 1.111 m3 • Earthworks (Eibau) - 1.300 m3 • Bored piles Ø 75 cm - 540 m • Sockets - 91 pcs. • Reinforcing steel - 41 t • Steel posts, bridge - 927 pcs. • Steel posts, route - 87 pcs. • Base plates, route - 83 pcs. • Wall elements, bridge - 9.110 m2 • Wall elements, route - 1.951 m2 Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.