Germany – Environmental institution building or planning – Expression of interest procedure for Geest eco-points for dry and nutrient-poor grassland (TR)
The Kiel Canal Waterways New Construction Office plans to construct a long-term storage facility for dredged material, soil material and other mineral materials from the Kiel Canal and from the NOK expansion projects, with a maximum storage
Opportunity description
The Kiel Canal Waterways New Construction Office plans to construct a long-term storage facility for dredged material, soil material and other mineral materials from the Kiel Canal and from the NOK expansion projects, with a maximum storage period of 3 years for each delivered material, at Flemhuder See on a total area of approximately 75 ha. The aim of the long-term storage facility at the Flemhude site is to establish a central operation for the treatment, recovery and temporary storage of the aforementioned materials and to ensure its long-term operation close to the canal. For the construction of a long-term storage facility, interventions in nature and the landscape (§§ 14-17 BNatSchG) must be compensated for or replaced. The intervention area of the Flemhude LZL was mapped in the years 23/24 and the compensation requirement was determined using the “Guidance framework for inventory recording, assessment and determination of compensation measures within the scope of landscape conservation support planning for road construction projects”. . The required eco-points in the Geest are divided into3 different specialist lots. The following presentation shows the total requirement for eco-points in the Geest by biotope type and number of eco-points: Inland waters (FS) -11,572 (Geest eco-points Lot1) Reed beds (NR) -139,270 (Geest eco-points Lot2) Dry and nutrient-poor grassland (TR) -606 (Geest eco-points Lot3) . The requirement put out to tender here is for 606 eco-points for dry and nutrient-poor grassland (TR) in the Geest. . The expression of interest procedure is not a formal procurement procedure or the award of a public contract. This procedure does not create any legal obligation. . No remuneration will be granted for participation in the expression of interest procedure. The costs incurred by interested parties in preparing their submissions will not be reimbursed. Expenses will also not be reimbursed. . Following this inquiry, a procurement procedure will be conducted to acquire the eco-points with the interested companies. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.