Germany – Environmental planning – VDE 8.1 Freight Train Route PFA 16 Revision of Environmental Approval Planning (LBP, EIA Report, AFB)
As part of the freight train route project, here PFA 16, comprehensive species and biotope structure surveys are required. The adjustment of the application documents as part of a revision is to be awarded through the attached invitation to tender. The subj
Opportunity description
As part of the freight train route project, here PFA 16, comprehensive species and biotope structure surveys are required. The adjustment of the application documents as part of a revision is to be awarded through the attached invitation to tender. The plan approval section 16 in question extends north of Fürth-Kronach, closely bundled with the A73 federal motorway, for a length of approx. 3.3 km northwards to the level of Nürnberg-Kleingründlach. The planned double-track freight train route runs in a tunnel and trough only in the southernmost part of PFA 16; otherwise, it runs above ground and mostly on an embankment, with several railway overpasses. In addition, the relocation of a crossing overhead railway power line and the construction of a new emergency drinking water interconnection pipeline are required. In this procurement procedure, the environmental planning services for the timely preparation of three approval documents for PFA 16 Freight Train Route are to be awarded: - Landscape Management Accompanying Plan (LBP), - Environmental Impact Assessment Study (EIA Report), - Species Protection Assessment (AFB), with the required entries in FINK. In addition, schedules must be submitted and maintained in coordination with the contracting authority, and cost plans must be updated. Procedure: neg-w-call. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.