Germany – Excavating and earthmoving work – New Main Fire Station Preparatory Earthworks
Construction of the new Bielefeld main fire station approx. 450 m of construction fencing to be supplied, erected and maintained approx. 875 m of construction fencing to be upgraded 1 unit tire washing system to be installed, maintained, dismantled. approx. 500 m2 of hedges and bushes to be cleared, disposed of approx. 19,500 m2 construction si
Opportunity description
Construction of the new Bielefeld main fire station approx. 450 m of construction fencing to be supplied, erected and maintained approx. 875 m of construction fencing to be upgraded 1 unit tire washing system to be installed, maintained, dismantled. approx. 500 m2 of hedges and bushes to be cleared, disposed of approx. 19,500 m2 construction site to be cleared approx. 1,650 m soldier pile and lagging shoring for explosive ordnance investigations approx. 12 explosive ordnance clearance operations to a disturbance point depth of 8 m Provision and preparation of temporary storage area incl. sealing of subsoil approx. 1,800 m3 topsoil to be removed, disposed of approx. 40 m3 soil to be excavated, transported, disposed of Z 1.1 approx. 7,910 m3 soil to be excavated, transported, disposed of Z 1.2 approx. 13,380 m3 soil to be excavated, transported, disposed of Z 2 approx. 4,700 m3 soil to be excavated, transported, disposed of Z 0 approx. 1,435 m3 soil to be excavated, transported, disposed of > Z 2 approx. 2,425 m3 rock to be excavated, transported, disposed of Z 0 approx. 120 m3 rock to be excavated, transported, disposed of Z1.1 approx. 10 m3 rock, to be excavated, transported, disposed of Z1.2 approx. 4,200 m3 rock to be excavated, transported, disposed of Z 2 approx. 325 m3 rock to be excavated, transported, disposed of > Z 2 approx. 19,500 m2 excavation base to be graded approx. 3,000 m2 temporary slope stabilization 6 construction wells to be constructed, maintained, dismantled incl. pumping equipment approx. 1,100 m drainage pipe to be supplied and installed approx. 400 m collector pipe to be supplied and installed 1 groundwater treatment system to be supplied, maintained, dismantled approx. 11 production wells and measuring points to be demolished incl. grouting Surveys incl. vibration measurements Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.