Germany – Facade work – New construction of the Fire Protection and Training Center (BAZ) at the Newel site
I. General description: The Trier-Land collective municipality plans to build a central fire protection and training center in Newel in order to consolidate the supraregional functions of the collective municipality fire brigade, utilize synergies and
Opportunity description
I. General description: The Trier-Land collective municipality plans to build a central fire protection and training center in Newel in order to consolidate the supraregional functions of the collective municipality fire brigade, utilize synergies and increase operational readiness. In the future, the building is intended to provide space not only for the secure accommodation of vehicles, but also for the storage and organization of a wide range of equipment. In addition to the facilities mentioned, training and meeting rooms will be provided, not only for regular training and information on new techniques, regulations and deployment strategies, but also for the centralized initial and continuing training of the fire service personnel throughout the Trier-Land collective municipality. The training area will be completed by a training yard and a training wall, which are specially designed for practical instruction and training. The supply and installation of a curtain wall facade are required here: Metal facade BAZ excluding FZH: - Structural calculations and installation and detail drawings - Approx. 20 m² cassette ceiling - Ceiling soffits - Approx. 930 m² support and hat profiles - Approx. 930 m² thermal insulation - Approx. 930 m² aluminum panel facade - Approx. 130 m reveal formation - Approx. 205 m upper facade termination - Approx. 240 m lower facade termination Metal facade FZH: - Structural calculations and installation and detail drawings - Approx. 240 m² facade substructure - Approx. 20 m² thermal insulation - Approx. 240 m² aluminum panel facade - Approx. 5m reveal formation - Approx. 75 m upper facade termination - Approx. 70 m lower facade termination The fire brigade’s workshop areas are supplemented by additional office and workshop areas of the collective municipality (municipal works yard, forestry special-purpose association) in order to cover a broader range of inspection, maintenance and repair work. The ground floor and the upper floor of the two-story building structure are planned as a solid reinforced concrete structure with a high degree of prefabrication. The external walls consist of reinforced concrete cavity walls, are thermally insulated and will receive a curtain wall facade made of aluminum with freely designed profile geometry. The vehicle hall is to be constructed as a conventional reinforced concrete frame structure. The partition wall between the vehicle hall and the adjoining ancillary-room program is designed as a reinforced concrete thermal wall. Inside, the reinforced concrete cavity walls are to remain predominantly exposed. The roof structure, in the form of a green roof with a PV system, rests on reinforced concrete girders and consists of a load-bearing trapezoidal sheet-metal shell as a warm-roof construction, with acoustic perforations on the underside. Metal facade BAZ excluding FZH: - Structural calculations and installation and detail drawings - Approx. 20 m² cassette ceiling - Ceiling soffits - Approx. 930 m² support and hat profiles - Approx. 930 m² thermal insulation - Approx. 930 m² aluminum panel facade - Approx. 130 m reveal formation - Approx. 205 m upper facade termination - Approx. 240 m lower facade termination Metal facade FZH: - Structural calculations and installation and detail drawings - Approx. 240 m² facade substructure - Approx. 20 m² thermal insulation - Approx. 240 m² aluminum panel facade - Approx. 5m reveal formation - Approx. 75 m upper facade termination - Approx. 70 m lower facade termination Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.