Germany – Floor laying and covering work – DLR Zittau site, GI new construction of office building, DI experimental hall, floor covering work (26-0037_B)
The German Aerospace Center (DLR) intends to expand its expertise in energy research at the Zittau site with the new construction of the DI Institute for Low-Carbon Industrial Processes. The new construction of the ZiRa pilot plant serves
Opportunity description
The German Aerospace Center (DLR) intends to expand its expertise in energy research at the Zittau site with the new construction of the DI Institute for Low-Carbon Industrial Processes. The new construction of the ZiRa pilot plant serves the development of emission-reduced industrial and power plant processes. Preparatory work Rubber sample areas – 8 units Closing shrinkage and construction joints – 350 m Leveling unevenness – 2,500 m² Filling connections – 500 m² Full-surface filling – 5,240 m² Cutting off perimeter insulation strips – 3,080 m² Epoxy resin floor coating WHG Basic cleaning of substrate – 1,700 m² Substrate preparation by diamond grinding – 1,700 m² Cutting cracks, dummy joints - 200 m Primer WHG – 1,700 m² Scratch coat WHG – 1,700 m² Self-leveling coating WHG - 1,700 m² Textured granules, slip resistance R10 - 1,700 m² Coved skirting – 520 m Skirting coating – 520 m Protective covering – 1,700 m² Rubber floor covering work Rubber floor covering 2 mm, dark gray – 1,310 m² Rubber floor covering 2 mm, orange – 850 m² Hygiene skirting, prefabricated system – 760 m Aluminum skirting board, light gray – 870 m Aluminum skirting board, gray-white – 1,100 m Producing permanently elastic sealing of aluminum skirting board – 2,380 m Initial cleaning/initial care of the special rubber covering – 2,150 m² Protective covering of the floor coverings – 2,150 m² Needle-punched carpet floor covering work Needle-punched carpet floor covering, office + meeting – 800m² Needle-punched carpet floor covering, conference room – 200m² Covering floor boxes, square – 22 units Perimeter connection – 300m Built-in components, profiles, etc. Stainless steel movement joint profile – 170 m Stainless steel dividing strip – 230 m Performance period: expected May 2026 - October 2026 Procedure: open. Estimated value: 352,696.5 EUR. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.