Germany – Heating, ventilation and air-conditioning installation work – MKK-WVSS: Instrumentation and control work
Construction of the ventilation system control system incl. heating circuit, as well as the static heating heating circuit and 18 zone valves for the Werner-von Siemens School in Maintal-Dörnigheim. Control components for controlling 1 ventilation system heating circuit incl. 1 S
Opportunity description
Construction of the ventilation system control system incl. heating circuit, as well as the static heating heating circuit and 18 zone valves for the Werner-von Siemens School in Maintal-Dörnigheim. Control components for controlling 1 ventilation system heating circuit incl. 1 ventilation system, mounting on mounting plate with DIN rail Control components for controlling 1 static heating heating circuit and 18 zone valves. Bus system for 10 fire dampers and 36 variable volume flow controllers. Associated cabling 1 damper/valve control assembly open/closed 74 binary input and output assemblies 34 continuous damper/valve control assemblies 69 sensor/measured-value input assemblies Procedure: neg-wo-call. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.