Germany – Heating, ventilation and air-conditioning installation work – New construction of 2-court sports hall Grüna / Lot 24 - Heating
Lot 24 - Heating Pellet boiler system 140 kW with storage room in the building and 3,000L buffer storage tank incl. control and pressure maintenance Heating circuit manifold with 5 mixing circuits up to DN50 Heat distribution network approx. 560m steel pipe up to DN50 incl. thermal insulatio
Opportunity description
Lot 24 - Heating Pellet boiler system 140 kW with storage room in the building and 3,000L buffer storage tank incl. control and pressure maintenance Heating circuit manifold with 5 mixing circuits up to DN50 Heat distribution network approx. 560m steel pipe up to DN50 incl. thermal insulation Heat distribution network approx. 130m stainless steel pipe up to DN40 incl. thermal insulation 20 pcs. fire protection pipe penetrations 7 pcs. circulation pumps approx. 520 m² underfloor heating with 3 pcs. heating circuit manifolds 230 m radiant ceiling panel incl. LED lighting 5 pcs. radiators Supplement to "Estimated contract duration": Start of construction: 11.01.2027 Completion of heating installation in the hall area (rough and final installation) (Titles 1.2 and 1.3 and 1.4, 40% each, and Title 1.5 Items 1.5.11-1.5.18): by 26.03.2027 Completion of rough installation, incl. fit-out of heating plant room incl. commissioning of heating boiler and underfloor heating (Title 1.1 at 100%; Title 1.2 and Title 1.3 and Title 1.4 at 50% each, Title 1.5 Items 1.5.1-1.5.10): by 18.06.2027 complete completion: by 22.12.2027 Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.