Germany – Heating, ventilation and air-conditioning installation work – Munich S-Bahn-MPAL_New construction of workshop and operations building_VE 3.5.2 Technical Building Services (HVAC and plumbing, compressed air, media supply)
The services of VE 3.5.2 Munich S-Bahn MPAL Technical Building Services HVAC and plumbing, media, de-icing essentially comprise the installation of the technical building services in all buildings and throughout the entire facility of the new mainten
Opportunity description
The services of VE 3.5.2 Munich S-Bahn MPAL Technical Building Services HVAC and plumbing, media, de-icing essentially comprise the installation of the technical building services in all buildings and throughout the entire facility of the new maintenance workshop with regard to the trades of heating, cooling, ventilation, sanitation, media supply and de-icing. The workshop building complex (WGK) is at the heart of the Munich-Langwied maintenance workshop. This building complex comprises the following parts of the building: vehicle hall (FZH) and multifunction hall (MFH), warehouse (LAG), administration and social building (VSG), infrastructure building (IG) and energy center (EZ). Additional buildings are arranged around the workshop building complex that are essential for maintaining maintenance operations and will also be technically fitted out within this scope of services. Listed from east to west, these are: infrastructure warehouse and carport (ICL), bogie warehouse (DGL), outdoor warehouse canopy (LOG), exterior cleaning facility and underfloor wheelset lathe (ARH), social and storage rooms for interior cleaning (IRA). Within the, the following services in particular are to be provided: - Wastewater, water and gas systems - Heat generation system, heat distribution systems and network - Ventilation systems and ventilation equipment - Refrigeration systems, partial air-conditioning systems and full air-conditioning systems - Geothermal well systems - Building automation - Compressed air supply - Media supply systems - De-icing systems Procedure: neg-w-call. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.