Germany – Heating, ventilation and air-conditioning installation work – Heating, sanitary and ventilation technology, Building Section 4 at Berufskolleg Bocholt West, 46399 Bocholt
Renovation at Berufskolleg Bocholt West, 46399 Bocholt Heating, sanitary and ventilation technology, Building Section 4 KG 410 Wastewater, water and gas systems: 2 WC systems, 6 washbasin systems, 3 utility sink systems approx. 140 m PE pipe for wa
Opportunity description
Renovation at Berufskolleg Bocholt West, 46399 Bocholt Heating, sanitary and ventilation technology, Building Section 4 KG 410 Wastewater, water and gas systems: 2 WC systems, 6 washbasin systems, 3 utility sink systems approx. 140 m PE pipe for wastewater drainage in nominal diameters DN 50 to DN 100 approx. 200 m stainless steel pipe for the drinking water supply in nominal diameters 15–35 mm KG 420 Heat supply systems: 51 panel radiators incl. thermostatic valves 3 tubular radiators incl. thermostatic valves approx. 670 m copper piping in nominal diameters from 15–76 mm KG 430 Ventilation systems: 1 inline duct fan 250 m³/h with accessories 5 single-room ventilators for internal rooms with accessories Spiral-seam ducting incl. accessories Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.