Germany – Heating, ventilation and air-conditioning installation work – Extension to Unesco School, 2nd construction phase - Heating
Extension to Unesco School, 2nd construction phase - Heating 1,000 lump sum heat generation systems for 2.850 sqm gross floor area 1,000 lump sum heat distribution networks for 2.850 sqm gross floor area 1,000 lump sum room heating surfaces for 2.850 sqm gross floor area Procedure: open. Review the original TED notice for the complet
Opportunity description
Extension to Unesco School, 2nd construction phase - Heating 1,000 lump sum heat generation systems for 2.850 sqm gross floor area 1,000 lump sum heat distribution networks for 2.850 sqm gross floor area 1,000 lump sum room heating surfaces for 2.850 sqm gross floor area Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.