Germany – Installation of cable laying – EPV: Manufacture, delivery, laying and installation of operational 110kV cable systems for Stromnetz Berlin GmbH
This EU tender comprises several individual projects divided into a total of 12 lots for the manufacture, delivery, laying and installation of operational 110kV cable systems for Stromnetz Berlin GmbH. 110kV overhead line replacement Rhinstr
Opportunity description
This EU tender comprises several individual projects divided into a total of 12 lots for the manufacture, delivery, laying and installation of operational 110kV cable systems for Stromnetz Berlin GmbH. 110kV overhead line replacement Rhinstr. – Friedrichshain Planned start of laying: 28.02.2028 110kV cable connection UW Reuter - UW Amalienhof Planned start of laying: 29.05.2028 110-kV cable connection UW ST – Joint 2 Boothstraße Planned start of laying: 01.10.2027 110-kV cable connection NK Malchow - UW Rüsternweg Planned start of laying: 01.10.2028 110-kV cable connection UW Beethoven – Marzahn Planned start of laying: 01.10.2027 110-kV cable connection UW Gaswerk Mariendorf Planned start of laying: 01.07.2028 110-kV cable connection Altes Gaswerk Gaswerk Mariendorf Planned start of laying: 01.07.2028 Procedure: neg-w-call. Estimated value: 1 EUR. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.