Germany – Installation of doors and windows and related components – Window and façade works - New Physics Building, Building 3335, Hans-Sommer-Straße 10, 38106 Braunschweig
The new building for the Institutes of Physics, with a usable floor area (NUF 1-6) of approximately 4,800 m², is being constructed on Hans-Sommer-Straße. In the four-story building, half of the area is designated for laboratories, measurement rooms and weighing rooms, which are located in the n
Opportunity description
The new building for the Institutes of Physics, with a usable floor area (NUF 1-6) of approximately 4,800 m², is being constructed on Hans-Sommer-Straße. In the four-story building, half of the area is designated for laboratories, measurement rooms and weighing rooms, which are located in the northern part of the building. Other usable areas include office spaces as well as seminar rooms and lecture halls. A foyer that connects the floor levels with one another via an atrium serves as the main access. On the ground floor, student workstations extend the foyer and provide access to the landscaped inner courtyard. The technical services center extends as a fifth floor over half of the building area. Aluminum punched windows, various dimensions/ total 141 units. Steel doors, various dimensions/ total 3 units. Single-story aluminum PR façades/ total 17 units. Multi-story aluminum PR façades/ total 2 units. Procedure: open. Review the original TED notice for the complete requirement, lots, amendments and attachments.
Business details are available after sign in
Codes, capabilities, evidence, buyer details and marketplace actions are withheld from the public HTML and API response.